EOP Determination by Means of VLBI-Network "QUASAR" Observations
Transactions of IAA RAS, issue 23, 55–60 (2012)
Keywords: VLBI, positioning & timing, EOP, "Quasar" efficiency
About the paperAbstract
Regular observations for determinations of Earth orientation parameters have been performed by the Russian VLBI network "Quasar" since August 2006. The observations are carried out weekly in the framework of two national programs: 24-hour sessions for determination of all EOP from observations on the "Quasar" network (Ru-E program) and 1-hour sessions for UT1 determination at "Zelenchukskaya" - "Badary" baseline (Ru-U program) using e-VLBI data transfer. EOP accuracy for 2011 observations from Ru-E sessions is about 1 mas for polar coordinates, 37s for dUT1, and 0.46 mas for Celestial Pole coordinates. Accuracy of dUT1 from Ru-U sessions is about 56 s. The results are available in 2-3 hours after the beginning of Ru-U sessions and in 2-3 days after Ru-E sessions.
Citation
A. Finkelstein, A. Ipatov, I. Gayazov, E. Skurikhina, S. Kurdubov, I. Surkis, S. Smolentsev, A. Salnikov, L. Fedotov, D. Ivanov, I. Rahimov, A. Dyakov, R. Sergeev . EOP Determination by Means of VLBI-Network "QUASAR" Observations // Transactions of IAA RAS. — 2012. — Issue 23. — P. 55–60.
@article{finkelstein2012,
abstract = {Regular observations for determinations of Earth orientation parameters have been performed by the Russian VLBI network "Quasar" since August 2006. The observations are carried out weekly in the framework of two national programs: 24-hour sessions for determination of all EOP from observations on the "Quasar" network (Ru-E program) and 1-hour sessions for UT1 determination at "Zelenchukskaya" - "Badary" baseline (Ru-U program) using e-VLBI data transfer. EOP accuracy for 2011 observations from Ru-E sessions is about 1 mas for polar coordinates, 37s for dUT1, and 0.46 mas for Celestial Pole coordinates. Accuracy of dUT1 from Ru-U sessions is about 56 s. The results are available in 2-3 hours after the beginning of Ru-U sessions and in 2-3 days after Ru-E sessions.},
author = {A. Finkelstein and A. Ipatov and I. Gayazov and E. Skurikhina and S. Kurdubov and I. Surkis and S. Smolentsev and A. Salnikov and L. Fedotov and D. Ivanov and I. Rahimov and A. Dyakov and R. Sergeev},
issue = {23},
journal = {Transactions of IAA RAS},
keyword = {VLBI, positioning & timing, EOP, "Quasar" efficiency},
pages = {55--60},
title = {EOP Determination by Means of VLBI-Network "QUASAR" Observations},
url = {http://iaaras.ru/en/library/paper/754/},
year = {2012}
}
TY - JOUR
TI - EOP Determination by Means of VLBI-Network "QUASAR" Observations
AU - Finkelstein, A.
AU - Ipatov, A.
AU - Gayazov, I.
AU - Skurikhina, E.
AU - Kurdubov, S.
AU - Surkis, I.
AU - Smolentsev, S.
AU - Salnikov, A.
AU - Fedotov, L.
AU - Ivanov, D.
AU - Rahimov, I.
AU - Dyakov, A.
AU - Sergeev, R.
PY - 2012
T2 - Transactions of IAA RAS
IS - 23
SP - 55
AB - Regular observations for determinations of Earth orientation
parameters have been performed by the Russian VLBI network "Quasar"
since August 2006. The observations are carried out weekly in the
framework of two national programs: 24-hour sessions for
determination of all EOP from observations on the "Quasar" network
(Ru-E program) and 1-hour sessions for UT1 determination at
"Zelenchukskaya" - "Badary" baseline (Ru-U program) using e-VLBI data
transfer. EOP accuracy for 2011 observations from Ru-E sessions is
about 1 mas for polar coordinates, 37s for dUT1, and 0.46 mas for
Celestial Pole coordinates. Accuracy of dUT1 from Ru-U sessions is
about 56 s. The results are available in 2-3 hours after the
beginning of Ru-U sessions and in 2-3 days after Ru-E sessions.
UR - http://iaaras.ru/en/library/paper/754/
ER -